
Back to ProductsIndustrial Construction
Structural Framework
Expansion project adding 75,000 square feet of structural framework to existing industrial facility. Engineered to support future growth while maintaining operational continuity.
Client
Heavy Industries Ltd.
Location
San Antonio, TX
Duration
14 months
Completed
December 2023
The Challenge
Integration with existing 40-year-old structure required careful structural analysis and innovative connection details. Work had to proceed without disrupting ongoing operations.
Our Solution
3D laser scanning captured existing conditions precisely. Engineered custom connection systems to bridge old and new structures. Nighttime and weekend construction schedule minimized operational impact.
Results & Achievements
- Seamless integration with existing structure
- Zero operational downtime
- Exceeded seismic requirements by 25%
- Designed for future vertical expansion
- Completed under budget by 8%
Ready to Start Your Project?
Let's discuss how we can bring your vision to life with the same excellence and dedication.
